Showing posts with label 100 Day Hustle. Show all posts
Showing posts with label 100 Day Hustle. Show all posts

Wednesday, November 28, 2012

WIP Wed AND 100 Day Hustle

Those of us participating in the 100 day hustle are 2/3 of the way there.  33.333333 days to the end of the year!

Kelsey Sews
So we'll do a bit of Work in Progress today and also a check on the Hustle List


1. Ruby Windows Quilt - quilted and bound    Finished!  Blogged Here.
2. Tulane Windows Quilt  Finished!  Blogged Here.
3. Ruby Baby Quilt - quilted and bound   Finished!  Blogged Here.
4. Ombre Quilt - Finished!  Blogged Here.
5. Made in Cherry Christmas Quilt - Inches to go!
6. Four In Art Quilt  Finished!  Blogged Here.
7. Gift Quilt  - Binding needs to be sewn down
8. Pioneer Sampler - Basted!
9. Asian quilt - meh.  Looked at it the other day.  Still not motivated to work on it.

Things I'm working on that weren't on the original list:
This week's finish!  Mitten Quilt   Original Post Here.  
I've decided the leaves/berries need to go.


December Calendar - need to finish the numbers.  The binding is done.  I just didn't feel like taking another picture.

Check out the other WIPS here at Freshly Pieced.
WIP Wednesday at Freshly Pieced

Friday, October 12, 2012

100 Day Hustle Update

Kelsey Sews
Let's take a look at how things are going.  This is more for getting me moving on things - but I guess you all have to be subjected to it!


1. Ruby Windows Quilt - quilted and bound    Finished!
2. Tulane Windows Quilt
3. Ruby Baby Quilt - quilted and bound   Finished!
4. Ombre Quilt - quilted and bound  This one is quilted (finally) and the binding is machine sewed.  Will do the hand work later.
5. Made in Cherry Christmas Quilt
6. Four In Art Quilt
7. Gift Quilt
8. Pioneer Sampler
9. Asian quilt





Obviously when I said I wanted them all done by the end of Oct - I was talking crazy!  I am off to work on number 6.


Saturday, September 22, 2012

The 100 Day Hustle

Who can resist joining a group with a name like the 100 Day Hustle?  Kelsey Sews is hosting a link-up with the idea to get us motivated and finishing up projects during these last 100 days of 2012.

Kelsey Sews
Since this is what I've been thinking about anyway, its perfect timing.

So the list.

1. Ruby Windows Quilt - quilted and bound
2. Tulane Windows Quilt - quilted and bound
3. Ruby Baby Quilt - quilted and bound
4. Ombre Quilt - quilted and bound
5. Made in Cherry Christmas Quilt - quilted and bound
6. Four In Art Quilt started and finished
7. Gift Quilt started and finished
8. Pioneer Sampler - quilted and bound
9. Asian quilt finished

To be completely honest, those are just the things I'd like to have done by the end of October.  I have a few other miscellaneous things lying around, half started projects and the like, but these 9 things are what I'd like to have out of the way.  Then I can feel free to move on to things like the two long awaited and planned quilts for E & W.  I know what I'm going to do and have most of the fabric.  It would be great to have them done for Christmas.  We will see.  I'm not truly planning on any sewing presents for Christmas, but things usually come up.